EBS

  • Project:Electronic Based Systems Center
  • Status:Built
  • Typology:EDU, OFF
  • Location:Graz (AT)
  • GBA:5.422 m²
  • Year:2020-02
  • PS:1–7 (GP)

HAN

  • Project:Bothfelder Kirchweg Residences
  • Status:Construction
  • Typology:HOU
  • Location:Hanover (DE)
  • GBA:3.908 m²
  • Year:2014-11
  • PS:1–5

WAS

  • Project:Social Housing – 170 Units
  • Status:Built
  • Typology:HOU, URB
  • Location:Vienna (AT)
  • GBA:23.000 m²
  • Year:2015-06
  • PS:1–8 (GP)

HOL

  • Project:Bruckner Tower Linz
  • Status:Construction
  • Typology:EDU, HOU, MIX, URB
  • Location:Linz (AT)
  • GBA:59.990 m²
  • Year:2017-03
  • PS:1–7

KAP

  • Project:The Kapellenhof
  • Status:Built
  • Typology:HOU
  • Location:Vienna (AT)
  • GBA:51.680 m²
  • Year:2019-10
  • PS:AT 1–5, 7

RPA

  • Project:Reese Park Augsburg
  • Status:Planning
  • Typology:HOU
  • Location:Augsburg (DE)
  • GBA:19.600 m²
  • Year:2017-07
  • PS:1–4

W12

  • Project:Residential Quarter Freiham W12
  • Status:Planning
  • Typology:HOU, MIX
  • Location:Munich (DE)
  • GBA:20.967 m²
  • Year:2019-04
  • PS:1–5

NBH

  • Project:Residential and Commercial Building
  • Status:Built
  • Typology:HOU, MIX, OFF
  • Location:Vienna (AT)
  • GBA:12.986 m²
  • Year:2020-01
  • PS:AT 1–5, 7

LUD

  • Project:Residential Quarter Ludlstraße
  • Status:Construction
  • Typology:HOU, URB
  • Location:Munich (DE)
  • GBA:56.400 m²
  • Year:2015-03
  • PS:1–5

NBO

  • Project:Interior Design of the ÖVW office
  • Status:Built
  • Typology:OFF
  • Location:Vienna (AT)
  • GBA:1.970 m²
  • Year:2019-12
  • PS:1–7

HIL

  • Project:Residential Quarter Hilligenwöhren
  • Status:Planning
  • Typology:HOU
  • Location:Hanover (DE)
  • GBA:8.710 m²
  • Year:2016-06
  • PS:1–5

FWA

  • Project:Freiham Residential Ensemble
  • Status:Construction
  • Typology:HOU, MIX
  • Location:Munich (DE)
  • GBA:35.625 m²
  • Year:2016-02
  • PS:1–8