Yesterday
You have spent too much time here โ€” try again tomorrow.

Public Space Design Maria-Theresien-Strasse

Innsbruck (AT)
IBK
Granite, brass, crafts
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Public Space Design Maria-Theresien-Strasse
Awarded / PUBLIC SPACE
Project dataView

Planning: AllesWirdGut

Project stages: 1โ€“5

Client: Stadt Innsbruck

Invited Competition: 12.2006 - 1st Prize

Completion: 04.2018

GFA: 8,700 mยฒ

Team: Alexandra Seip, Jan Schrรถder, Johanna Kropp, Lena-Maria Philipp, Martina Arend

Light planning: Pokorny Lichtarchitektur

A redesigning of Maria-Theresien-StraรŸe that does justice to the significance that the street has in the townscape of Innsbruck: the goal was to create an urban site with a rich atmosphere that invites strolling, hanging out, and meeting people.

The identity of the site derives from the tension between urbanity and a panoramic view into nature, between past and future, between a specific character and a connective function in the urban structure of Innsbruck.

Two defining materials, granite and brass, balance these dualities in the redesigning: a slab carpet of four different types of granite creates a coherent square surface, and a network of brass-colored ground plates with street furniture growing up from it defines the square area proper in the middle of the street.

At night, the walking zones alongside the house faรงades are brightly lit, while low-set lighting in the middle of the square enables a view of the mountain silhouette and the stars above.

Photos: Hertha Hurnaus, Photo (bottom gallery): AllesWirdGut, Illustrations: AllesWirdGut

HOS
2022
Planning
Bremen (DE)
33.357 mยฒ
33.357 mยฒ
Planning
2022
Digitalization & BIM / HOUSING / MIXED USE / URBANISM

Quarter Holsteiner Strasse

Free Space After Free Space

ROM
2005โ€”2009
Built
St. Margarethen (AT)
10.000 mยฒ
10.000 mยฒ
Built
2005โ€”2009
Awarded / CULTURE

Redesign of the Roman Quarry

Spectacle Under The Stars

NLS
2016โ€”2018
Built
Everywhere (X)
13 mยฒ
13 mยฒ
Built
2016โ€”2018
Experimental / HOUSING

Mobile Living

On the road

Wrong Time Zone

Rotate back